DESCRIPTION |
DIRECT RATE |
|
UNIT |
| Overhang calculation with drawing |
170.00 |
|
Both |
| Interior calculation with drawing |
120.00 |
|
Both |
| Precast Lift Anchor location drawing w/o concrete stress analysis or rigging |
55.00 |
|
Each |
| Precast Lift Anchor location drawing, including rigging, w/o concrete stress analysis |
80.00 |
|
Each |
| Precast Utility Box/Tank Lift Anchor location drawing, w/o concrete stress analysis or rigging |
55.00 |
|
Each |
| Precast Utility Box/Tank Lift Anchor location drawing, including rigging, w/o concrete stress analysis |
80.00 |
|
Each |
| Precast standard concrete stress analysis calculation package |
55.00 |
|
Each |
| Precast complex concrete stress analysis calculation package |
110.00 |
|
Each |
| Precast and Masonry Bracing detailing and calculation |
85.00 |
|
Each |
| Additional copies (3 provided) |
0.20 |
|
Sheet |
| Professional Engineer’s seal per structure |
600.00 |
|
Each |
| Senior Professional Services |
120.00 |
|
Hour |
| Misc. Services: |
60.00 |
|
Hour |
| Electronic drawing transfer (11”x17” or smaller) |
0.50 |
|
Sheet |
| Electronic drawing transfer (larger than 11”x17”) |
2.50 |
|
Sheet |